- Why is horizontal directional drilling (HDD) used for this project?
- HDD is employed at the landfall site to install the cable conduits deep beneath the shoreline without disturbing the sensitive coastal environment, beaches, or nearshore marine habitats. This trenchless technology minimizes the ecological footprint of the project and protects the cable from wave action and coastal erosion.
- How does the second interconnector support Malta's green transition?
- A stronger interconnection with Sicily allows Malta's grid operators to manage the intermittency of local solar power by importing balancing power when domestic generation drops. Additionally, it opens up the possibility for Malta to export surplus renewable energy back to the European grid in the future, facilitating higher national decarbonization targets.
- What is the capacity and technical specification of the new cable?
- The IC2 project consists of a 220 kV high-voltage alternating current (HVAC) subsea cable system with a transmission capacity of 225 MW. It will run parallel to the first interconnector, spanning approximately 118 kilometers across the Mediterranean seabed between Malta and Sicily.